Welcome to Yuexin Engineering Co., Ltd.
Hangzhou Yuexin Engineering Technology Co., Ltd.
Hotline
400-8540068
Case Automatic drug - adding system
案例名称: 自动加药
说明:
Total1Article页次1/1HomePrev1Nextlast
Please tell me your need to reply to you within 24 hours
 
Q & A: MORE >>
  • 1.Central air conditioning yellow water how to do?
    A:
    Central air-conditioning chilled water and condensate water are recycled water, the cycle will be adsorbed in the air of dust, foreign bodies, etc., water will generate microorganisms, so require regular replacement of water, if dirty very interested, or even to add special cleaning agent Cleaning; if condensation in the condenser more scale, will result in cooling effect of central air conditioning decreased, electricity consumption increased, so also regularly open the cleaning condenser. The way to do this is to change the frequency of cooling water and condensate and to clean the condenser……
  • 2.Circulating cooling water algae growth in a lot of how to deal with?
    A:
    Circulating water due to nutrient concentration, temperature and summer prolonged sunshine, bacteria and algae to create a rapid breeding conditions. Much like the mucilage secreted by bacteria, it allows dust and chemical buoys floating in the water to bond together to form slimy sediments. A biofouling sludge attaches to the heat transfer surfaces of the host condenser Heat transfer filler), in addition to causing corrosion under the scale, but also to reduce the flow of circulating water, reducing heat exchange efficiency, increase power consumption and host load, in severe cases will plug the pipeline……
  • 3.Cooler fouling can clean it?
    A:
    Can be cleaned. Cooler fouling is generally divided into two types of tube fouling and tube fouling, as circulating water generally use soft water, so fouling tube generally does not appear, unless your circulating water is not soft water, remove the detergent first Use soft water cycle. Most of the cooler scaling is outside the tube scaling, there are two reasons for its study, first, the circulating water pipe is too high, because the spray water is generally used groundwater that is hard water, so if the tube temperature is too high will make the spray water temperature Rise, the formation of scale in the pipe wall, the second is spray water itself with high Mg and other elements, especially in mountainous areas, the water is relatively hard……
Contact us

No public

phone:400-854-0068
fax:0571-87243867
mailbox:hzyuexin8@163.com
Q Q:2637788248
Company Address: No.37 Gaoke Road, Guangzhou Tianhe Smart City
Address: Room 2302, Block C, Xizi International, Jianggan District, Hangzhou City, Zhejiang Province

About us
Company address: the company is located in Guangzhou Tianhe wisdom City hi tech Road No. 37Website operation center address: room 2302, C, West International, Jianggan District, Zhejiang, HangzhouPhone number: 4008540068Fax 0571-87243867Mailbox: hzyuexin8@163.comQQ put two: 2637788248   3524382493WeChat public number:
Copyright ©2017- 2020 Hangzhou Yuexin Engineering Technology Co., Ltd.
犀牛云提供企业云服务
X
1

QQ设置

  • 客服QQ
  • 客服QQ
3

SKYPE 设置

4

阿里旺旺设置

6

二维码

展开

浙公网安备 33010402003408号